All mechanical works of the new Pelsan Textile factory in Çerkezköy.
Showing 114 out of 114 results
All mechanical works of the new Pelsan Textile factory in Çerkezköy.
MEP, process, pressured and steam piping works of additional production facility of Mondelez International in Istanbul.
All mechanical works of Kağıthane, Hasdal and Kemerburgaz stations and service stations on the new 70 km Gayrettepe – Istanbul New Airport Metro.
Mechanical Works of International Cosmetology Center with 9.650 m² indoor area. The facility has mini operating rooms, spa center and beauty salons.
Electromechanical works of the Terminal 3 and Terminal 4 buildings of King Khaled International Airport in the capital of Saudi Arabia.
One of the 2 new textile factories in Babadajhan and Kaakha regions of Turkmenistan. We have been awarded the textile climatization and electromechanical works.
One of the 2 new textile factories in Babadajhan and Kaakha regions of Turkmenistan. We have been awarded the textile climatization and electromechanical works.
Turn-key Works (Civil, Architecture, MEP, Fit Out) of sales office at the Taksim 360 project.
Revamping of a bidrum heat recovery boiler (steam flow rate of at 50 TPH 48 barg and 400°C ) in Turkmenistan.
Hotel project at the city center of Ashgabat, the capital of Turkmenistan. All mechanical works (plumbing, HVAC, firefighting and BMS) are in our scope.
With 26.500 m² indoor area, this 130 bed capacity burn treatment center will have 4 operating theaters and 20 intensive care units. Our scope in this project consists plumbing, HVAC, firefighting, BMS, natural gas installations and MCCs.
This project at the center of the Asian side of Istanbul consists hotel, residence and restaurant floors. Our scope is complete electromechanical works.
MEP, process and tank manufacturing/erection works of new glass factory.
This project is under GE & GAMA Partnership. Our scope, in the 1,792 megawatts (MW) Power Station 5, includes BOP Mechanical Erection and Electrical Works.
Mechanical works of 88.000 m² Hilton Hotel and Convention Center project within the new Tashkent City International Business Center.
70.000 WDI pipe welding and installation works, cylindrical tank fabrication and erection works, GRP pipeline and MEP works of process and non-process buildings.
With 1.115.000 tonnes of production capacity per year, this facility became the largest urea and ammonia production plant of Turkmenistan when completed.
Turn-key Works (Civil, Architecture, MEP, Fit Out) of 25.000 m² residential and 4.000 m² commercial areas and carpark of lots 385, 386 and 387 within Taksim 360 project.
Design, manufacturing and installation works of 9 cylindrical and 1 prismatic storage tanks
All mechanical works of office blocks, tv studios, printing press facilities and carpark with total indoor area of 250.000 m²
Subbase piping works and mobilisation for new hospital and office project by Acibadem Health Group
All mechanical works of residential project
Bahrain International Airport Modernization Project consists of a 220.000 m² new passenger terminal building, 130.000 m² carpark and 9.000 m² central utility complex with a total indoor construction area of 359.000 m². Total cooling load of the terminal will be 48.000 kW provided by 6 water cooled chillers.
This project will increase the capacity of the airport to 14 million passengers per year.
The scope of this Turkmenistan Energy Ministry project consists of the erection of 4 HRSG units, 90.000 WDI pipe spool fabrication and installation, RMS system, fire protection system, pumping station installations and mechanical contracting of the administration buildings.
The scope of the project is the expansion of existing Ro-Ro terminal, and construction of new ferry and passenger terminal, container terminal, cargo port, loading port and shipbuilding facility. Our scope consists of the mechanical infrastructure and superstructure works of 28 steel and concrete buildings.
With an indoor area of 29.000 m², this hospital has 18 operating rooms and 180 beds. 3 aircooled chillers provide 4.050 kW of cooling in total. This building is connected to the Endocrinology Hospital via a bridge like structure.
With an indoor area of 22.000 m², this hospital has 120 beds. 2 aircooled chillers provide 3.000 kW of cooling in total. This building is connected to the Surgery Hospital via a bridge like structure.
Located in financial district in Ataşehir, Istanbul, this project consists of residences, shopping mall, carpark and auxiliary buildings for a total of 565.000 m² indoors area in our scope of works (C,D,E, G buildings). Total cooling capacity is 26.200 kW and heating capacity is 22.400 kW.
At the heart of Anatolian side of İstanbul, our scope for this project is the mechanical works of shopping mall and carpark and the electro-mechanical early works of North Tower hotel and residences. The scope adds up to a total of 200.000 m² air ducts and 24.000 kW cooling load in 700.000 m² indoor area.
Electromechanical works of chiller plant and energy center of the university which house 14 chillers. Scope includes but not limited to the supply and installation of all chillers, circulation pumps, fire pumps, switchgears, generators, MCC and DDC panels.
Electromechanical works of 6 residence buildings of a 72 building project.
This 10.600 m² building will house companies within Çalık Holding such as Çalık Enerji, GAP İnşaat ve GAP Pazarlama. Total cooling load is 1.500 kW.
This project has been completed in a short period of 6 months.
This 3 building hospital with 11.000 m² indoor area and 1.400 kW cooling load has been designed to fit the World Health Organisation criteria.One of the four hospital projects undertaken at the same time in 2016 in Ashgabat.
This hospital with 18.000 m² indoor area and 2.700 kW cooling load has been designed to fit the World Health Organisation criteria.One of the four hospital projects undertaken at the same time in 2016 in Ashgabat.
This 3 building hospital with 120 bed capacity, 25.000 m² indoor area and 2.500 kW cooling load has been designed to fit the World Health Organisation criteria. One of the four hospital projects undertaken at the same time in 2016 in Ashgabat.
Being the first morphology center in Ashgabat, this hospital with 27.000 m² indoor area and 3.100 kW cooling load has been designed to fit the World Health Organisation criteria. One of the four hospital projects undertaken at the same time in 2016 in Ashgabat.
Mechanical rooms of the new T5 terminal
This 7 story, 4 star hotel is within the Medinah International Airport grounds is being operated by Millenium Hotels.
Electromechanical works of faculty building
Mechanical works of Miranlı Yarn Facility with total indoor area of 35.000 m². Scope includes the climatization of texturized processes, mechanical works of compressor plant, fire protection plant, water plant and administration buildings.
The fire detection and protection works of glassware warehouse building.
Underground pre-insulated chilled water piping and A1 jet fuel transmission lines.
With an indoor area of 21.000 m², this medical research center has specialized clean rooms with ventilation and air conditioning with hygiene specifications.
This 120 bed hospital has 4.000 kW of cooling capacity with 3 chillers serving the building. Indoor area of 27.000 m². This project was completed and opened along with Ashgabat Research Center.
This building inside the Medinah International Airport site serves as the facility to provide on-board catering services for the flights for Saudia Airlines. The 5.000 m² building has 2.000 kW of cooling load. As per the requirements of the building with large kitchen areas, special hood extinguishing systems, cold rooms and large capacity grease interceptors were installed.
At one of the prime locations in Istanbul, near the Bosphorus Bridge, this 38 buildings on 50.000 m² area consisting 209 luxury apartments complex has residential units, a recreational facility, indoor swimming pool and carpark.
This new airport project has 200.000 m² passenger terminal building, and auxiliary buildings such as a mosque, hajj pavilion, fire station, technical center, utility complex. The project aims to aid the increasing hajj traffic and is a part of the modernization projects of Saudi Arabia. The project has 32.000 kW of cooling power, 160.000 m² galvanized ducts, a tunnel jet fan system and preinsulated underground chilled water pipe lines.
The mechanical technical support was provided by Sonmez after the end of the project for two years as a separate contract.
VRF units and air handling units with DX outdoor units were used in this office project. HVAC, plumbing, fire fighting and BMS works of the project were in scope.
The contract consist of a 32.000 m² Emergency & First Aid Hospital in Ashgabat along with four Emergency Medical Centers located in Mary, Dasoguz, Turkmenabat and Balkanabat. With 230 bed capacity the hospital in Ashgabat is one of the largest in the country and has two chillers with the total cooling capacity of 2.000 kW.
Mechanical works of Derweze Power Plant administration and control center offices.
Located in the prime commercial center of Istanbul, in Levent; this 322.000 m² shopping mall, carpark, office and hotel complex was designed and built as per LEED GOLD standards.
120.000 m² factory project consisting of welding, assembly, paint, auxiliary workshops, and utility cooling, heating, compressed air, water treatment plants and auxiliary buildings.
This 5.500 m² facility has the production capacity of 10 million units per year. Along with HVAC, plumbing, fire fighting and BMS works; the stainless steel process piping for steam was also in the scope of works.
7.000 m² luxury residence mechanical works and restoration.
This building is a part of modernization of power supply for Ashgabat and controls the distribution of power throughout the city.
Restoration works of residences
Process conditioning of glass manufacturing factory with special duct constructions for airflow redirections.
Complete mechanical works of 16.000 m² dental hospital
Project consists of buildings with total indoor area of 18.000 m² and site works. 6.000 tons of piping, 5.300 steel construction, process electricity works and instrumentation with 13 million manhours of labor.
This luxury complex project has 97.000 m² indoor area consisting of residences, apartments and carparks. VRF system is used for HVAC needs.
All mechanical works of 16.000² eye hospital.
Project consist of a 62.000 m² shopping mall and a carpark with the capacity of 1000 cars.
Mechanical restoration works of 2 twin 32 story towers with 160.000 m² indoor area
This 130.000 m² airport has 7 million passenger per year capacity. Total cooling load is 11.500 kW. 70.000 m² galvanized ducts were manufactured and installed. Along with the passenger terminal building, control tower and auxiliary buildings were in contract scope.
All mechanical works of 12.000² hospital.
Mechanical works of 200.000 m² residence, shopping mall and carpark project.
Revision works of operational facility. 80 km firefighting and fuel piping
21 km DN1300 epoxy coated steel pipe line, water intake building, pumping station and 2.000 m³ water tanks.
All mechanical works
Inside the Erzurum Airport site, expansion works of facility include 2 units of 400 m³ cylindrical tanks, pumping station, fuel piping, fire fighting and hydrant system
Expansion works including 2 units of 20.000 m³ and 2 units of 10.000 m³ cylindrical tanks, 2.5 km fuel piping and manifolds, 3.5 km fire fighting piping and hydrant system, 3 sets of 800 m³/h fuel pump supply and installation
Mechanical works of 30.000 m² office building
Expansion works including 4 units of 5.000 m³ cylindrical tanks, fuel piping, fire fighting piping and hydrant system
Mechanical works including compressed air system
*Project undertaken as Sönmez Yapı
Mechanical works of 16.000 m² building
Expansion works. 3 units 20.000 m³, 1 unit 10.000 m³ cylindrical tank manufacturing and erection, 5.4 km fuel piping and manifolds, 1.5 km firefighting piping and hydrant system
Steel works and mechanical works of cement factory of 1.000.000 m² area. This facility has 1 million metric tonne per year production capacity.
Turnkey project of 15.000 m² factory building. Including all civil, mechanical, electrical contracting works, supply and installation of equipment. Project has 1.200 m² hygienic rooms, steam supply (4.000 kg/h ,8 bar), compressed air (6m³/min, 8 bar), demineralisation and reverse osmosis systems, HVAC, plumbing, fire fighting, water treatment
Mechanical works of 120.000 m² mall
All mechanical works of 90.000 m² passenger terminal building, utility center and water tanks. Cooling load 6.000 kW. 40.000 m² galvanized ducts.
All mechanical works, compressed air 8 bar, steam system 15.000 kg/h
Turn-key works of operational factory
2 units of 1.000m³ tank construction and erection and mechanical works of pumping stations
Electromechanical works of 24.000 m² office building
Turnkey works of textile factory
Mechanical works of 22.000 m² indoor area project including 3 chillers, 3 hot water boilers, 2 steam boilers, fire pumps, 5 air handling units, compressed air system, exhaust fans, piping, ducting and plumbing.
All mechanical contracting works and seismic protection of office tower with 80.000 m² indoor area. MCC related to mechanical works were also in scope.
Mechanical works of 20.000 m² media center building with 2 chillers, 18 air handling units, exhaust fans, firefighting system, BMS, all related piping, ducting plumbing works.
Mechanical works of blue jean washing, abrasion, outfitting facility – compressed air 12 m³/dak, 12 bar; steam 9.000 kg/h, 8 bar; heat recovery units, water treatment and 200 gr/h ozone generator
Project scope includes HVAC works 4 air handling units with the capacity of 300.000 m³/h, firefighting, electrical works, mechanical room, compressed air, all piping, ducting and plumbing works.
HVAC, plumbing, firefighting, BMS, compressed air system and electrical works of 20.000 m² campus building
20.000 m² office building mechanical works including 2 chiller units, 2 cooling towers, 2 hot water boilers, 9 air handling units, exhaust fans, firefighting system and pumps, all piping, ducting and plumbing works.
Mechanical works including 3 chiller units, 2 cooling towers, 2 hot water boilers, firefighting system, 4 air handling units, exhaust fans, split airconditioning units, all piping, ducting and plumbing.
Mechanical works of 16.800 m² facility including HVAC, firefighting, compressed air, plumbing, BMS
HVAC, Plumbing, Fire Fighting works including 1 chiller, 2 hot water boilers, 4 air handling units, pumps, all piping and duct works.
All mechanical works of 5.500 m² movie studios
Scope includes project design and mechanical contracting works for office tower blocks and shopping mall project of 190.000 m² indoor area. 16 chillers, 12 hot water boilers, 36 cooling water pumps, 18 heating water pumps and 12 air handling units.
Mechanical maintenance is undertaken since project completion and is still ongoing.
In the scope of mechanical works are 3 hot water boilers (3.250 kW), 2 chillers (2.200 kW), 21 air handling units, 11 exhaust fans, fire fighting system, piping and ducting.
Mechanical works of factory, including 8 Sonmez brand air handling units and clean rooms and control systems.
This 60.000 m² hospital has 611 beds, 16 operating rooms and an intensive care unit with 103 bed capacity.
Mechanical project, design and works of 18.000 m² business center
HVAC, Plumbing and Firefighting works for AlternatifBank Headquarters.
All mechanical engineering, design and works of new facilities for Penisilin and Cefobid. Maintenance works were overtaken after the project completion.
Design, manufacture and installation of 12 civil type air handling units with the total capacity of 1.825.000 m³/h. HVAC works of Grand Textile Workshop, Air Jet Textile Workshop, Knitting Workshop, Outfitting Workshop and Yarn Facility.