Al Omairah Island Accomodation & Non-Process Buildings Project

Description
Part of ADNOC’s strategic Lower Zakum Field Long Term Development Plan Phase-1 (LTDP-1), Package 3 covers the Engineering, Procurement, and Construction (EPC) of the Al Omairah Island Accommodation and Non-Process Buildings located in the Arabian Gulf, approximately 80 km northwest of Abu Dhabi. The comprehensive EPC scope encompasses major residential and non-process infrastructure, including three accommodation buildings, an office and clinic building, a kitchen, mess and recreation building, a laundry building, a mosque, multiple workshops, a permanent warehouse, a harbor building, a laboratory building, CICPA data and administrative facilities, temporary refuge buildings, a fire station with an HSE workshop, a waste management area, and a centralized HVAC building. The mechanical, electrical, plumbing (MEP), and industrial installation scope delivers a centralized HVAC plant with clean agent and sprinkler fire suppression systems, extensive electrical distribution, solar power systems for non-critical loads (such as street lighting and EV charging stations), robust telecommunication and LAN networks (including PAGA, CCTV, and radio), hot and ambient water supply distribution, sanitary plumbing, inter-connecting piping and cabling, earthing and lightning protection, and a centralized Building Management System (BMS) integrated with ECMS. Furthermore, the project includes specialized aviation infrastructure featuring a primary heliport and an elevated heliport on Accommodation Building A (complete with navigational aids, control panels, foam fire-fighting systems, and aviation lighting), jet fuel storage and dispensing systems, access roads, walkways, jogging tracks, landscaping, shaded solar parking canopies, boundary fencing, a diesel fuel filling station, underground stormwater and drainage networks, and all associated civil, structural, and foundation works.