Back to projects
Petrosen Fuel Stations

Description
Comprising site preparation, bulk excavation, and utility infrastructure installation, specialized environmental and mechanical works including the placement of underground storage tanks, double-walled fuel piping, canopy footings, and oil-water separators were executed, alongside civil and structural operations encompassing the erection of the canopy framework, construction of the convenience store, paving of the heavy-duty concrete forecourt, and installation of fuel dispensers, submerged turbine pumps, and automatic tank gauging systems, culminating in electrical and control integration, controller connections, emergency shut-off systems, pressure testing, and high-impact signage installation.