Back to projects
Transportation Industrial Completed

Petrosen Fuel Stations

Description

Comprising site preparation, bulk excavation, and utility infrastructure installation, specialized environmental and mechanical works including the placement of underground storage tanks, double-walled fuel piping, canopy footings, and oil-water separators were executed, alongside civil and structural operations encompassing the erection of the canopy framework, construction of the convenience store, paving of the heavy-duty concrete forecourt, and installation of fuel dispensers, submerged turbine pumps, and automatic tank gauging systems, culminating in electrical and control integration, controller connections, emergency shut-off systems, pressure testing, and high-impact signage installation.